Office: 713.699.5000
Houston, Texas 77018

Active Members of

Greater Houston Builders
Association
&

 

Welcome to the largest Construction Glossary on the net!
 

A - B - C - D - E - F - G - H - I - J - K - L - M - N - O - P - Q - R - S - T - U - V - W - X - Y - Z


P

Pallets: Wooden platforms used for storing and shipping bundles of shingles.

Parapet: A wall placed at the edge of a roof, especially a flat roof, to prevent people from falling off.

Payment Schedule: A pre agreed upon schedule of payments to a contractor usually based upon the amount of work completed. Such a schedule may include a deposit prior to the start of work. Payments are often scheduled for the beginning of the month and allow the contractor to subcontractors and suppliers by the 10th of the month. There may also be a temporary 'holdout' at the end of the contract for any small items which have not been completed.

Permit: A governmental authorization to perform a building process as in:

  • Zoning\Use permit: Authorization to use a property for a specific use e.g. a factory, a single family residence etc.
  • Grading permit: Authorization to change the contour of the land.
  • Septic permit: A health dept. authorization to build or modify a septic system.
  • Building permit: Authorization to build or modify a structure.
  • Electrical permit: A separate permit required for most electrical work.
  • Plumbing permit: A separate permit required for new plumbing and larger modifications of existing plumbing systems.

Pier: Any column of masonry that is used to support other structural members such as beams or girders.

Pitch: The degree of roof incline expressed as the ratio of the rise, in feet, to the span, in feet. See also slope. Also, a thick, oily substance commonly obtained from tar, used to seal out water at joints and seams. Pitch is produced from distilling coal tar, wood tar, or petroleum.

Pitch pan or Pitch pocket: A container, usually formed of sheet metal, around supporting connections with roof-mounted machinery. Filling the container with pitch, or better yet, plastic roof cement, helps seal out water even when vibration is present.

Plastic Roof Cement: Ultimate protection for those tough jobs is found in this specially formulated heavy-bodied material. Used as a waterproofing medium in new construction and as a general-purpose exterior repair and maintenance material. Stops roof and other leaks fast. Available in both summer and winter grades.

Ply: The number of layers of roofing; i.e. one-ply, two-ply.

Ply sheet: A layer in built-up roofing.

Plywood: Any sheet of wood made of 3 or more thin layers of wood that has been bonded together with glue.

Post: A vertical framing member usually designed to carry a beam. Often a 4" x 4", a 6" x 6", or a metal pipe with a flat plate on top and bottom (see diagram).

Pressure Relief Valve: A device mounted on a hot water heater or boiler which is designed to release any high steam pressure in the tank and thus prevent tank explosions.

Pressure treated lumber: Any wood that has been treated under pressure with some chemical preservative that protects the lumber from moisture and insects.

P-trap: A piece of pipe shaped like the letter P, used in drains. Its shape prevents fumes or sewage gases from going against the flow of draining water and entering the interior of a home

PVC or CPVC: A type of white plastic pipe sometimes used for water supply lines.

Back to top

Copyright © 1996-2008 Houston Remodeling.  |  Clients | Home | Contact us |